Riz long

Packaged product Getreide und Pasta Leader Price

Riz long contains 351 kcal per 100 g.

Roughly 89 % of its calories come from carbohydrates, with 9 % from protein and 3 % from fat (estimated with general energy factors).

That is close to the median for Getreide und Pasta on FoodFactly (350 kcal per 100 g).

The values are as declared on the product label and entered by Open Food Facts contributors.

Riz long by Leader Price, product photo
Photo: Open Food Facts, CC BY-SA 3.0, Open Food Facts contributors
351kcal per 100 g
7,5 gprotein
77 gcarbohydrates
1,1 gfat

Nutrition facts

The source reports no household measures (such as cups or pieces) for this food, so only weights are offered.

Nutrition facts for the selected amount
NutrientAmount per 100 g% DV
Calories L 351 kcal
Total fat L 1,1 g 1 %
Saturated fat L 0,1 g 0,5 %
Sodium L 200 mg 9 %
Total carbohydrates L 77 g 28 %
Dietary fiber not reported
Total sugars L 0 g
Protein L 7,5 g 15 %

% DV: percent of the FDA Daily Value for adults (reference amounts). Letters show how each value was obtained: M measured, C calculated, L label, Z assumed zero, I imputed. Vitamins and minerals not listed were not reported by the source.

Nutritional breakdown

Protein: 9 %Carbohydrates: 89 %Fat: 3 %351kcal / 100 g
  • Protein 9 %
  • Carbohydrates 89 %
  • Fat 3 %

Approximate share of calories, using general energy factors (4 kcal/g protein and carbohydrate, 9 kcal/g fat, 7 kcal/g alcohol).

Nutritional insights

  • Protein7,5 gin the top quarter of Getreide und Pasta (median 7 g)
  • Sugars0 gin the lowest quarter of Getreide und Pasta (median 0,4 g)
  • Fat1,1 gabove the median for Getreide und Pasta (median 0,9 g)
  • Saturated fat0,1 gin the lowest quarter of Getreide und Pasta (median 0,2 g)
  • Sodium200 mgin the top quarter of Getreide und Pasta (median 4 mg)
  • Protein per 100 kcal2,1 gprotein density, useful for comparing foods with different calorie levels

Product details

Brand
Leader Price
Barcode
3367350100109
Category
Langkörniger Reis
Nutri-Score
B as computed by Open Food Facts

Ingredients

Ingredients not reported.

Similar products

FoodCaloriesProteinCarbsFat
Reis-fit Jasmine Rice Reis-fit 351 7 g 78 g 0,5 g
Arroz largo Carrefour 351 8,3 g 76 g 1,2 g
Arroz Largo Dia 351 8,3 g 75,9 g 1,2 g
Arroz largo Domingo Grau 351 8,3 g 76 g 1,2 g
Langkorn Spitzenreis ja! 351 8 g 75,5 g 1,5 g
Langkorn Naturreis Davert 351 8,5 g 73,1 g 2,4 g
Spitzen-Langkorn Reis-Fit 351 7 g 78 g 1 g
Arroz largo Dia 351 8,3 g 75,9 g 1,2 g

Per 100 g. Calories in kcal. n/a: not reported by the source.

Frequently asked questions

How many calories are in Riz long?

100 g of Riz long has 351 kcal.

How much protein is in Riz long?

Riz long contains 7,5 g of protein per 100 g (15 % of the 50 g Daily Value). About 9 % of its calories come from protein. Compared with other Getreide und Pasta, that is among the highest quarter (median 7 g).

How many carbs are in Riz long?

Riz long has 77 g of total carbohydrates per 100 g, including 0 g of sugars. Label conventions differ: in the EU and some other regions carbohydrates are declared without fiber.

How much fat is in Riz long?

Riz long contains 1,1 g of fat per 100 g, of which 0,1 g is saturated (0,5 % of the Daily Value).

How much sodium is in Riz long?

100 g contains 200 mg of sodium, 9 % of the 2,300 mg Daily Value.

Where does this nutrition data come from?

From Open Food Facts, record dated 26. Mai 2025. FoodFactly last checked it on 6. November 2026. Each value above shows whether it was measured, calculated or taken from a label.

Source of the nutrition information

  • Open Food Facts, record 3367350100109. License: ODbL 1.0 (Open Food Facts). Source record dated 26. Mai 2025. Imported 6. November 2026.

Last updated: . Data quality score: 80/100 (how it is calculated).

Product data from Open Food Facts, made available under the Open Database License. Values are as declared on the label; labels can change over time, so check the package you have.

General nutrition information, not medical advice. Individual needs differ; see our disclaimer.