Riz long
Packaged product Grains and Pasta Leader Price
Riz long contains 351 kcal per 100 g.
Roughly 89% of its calories come from carbohydrates, with 9% from protein and 3% from fat (estimated with general energy factors).
That is close to the median for grains and pasta on FoodFactly (350 kcal per 100 g).
The values are as declared on the product label and entered by Open Food Facts contributors.
Nutrition facts
The source reports no household measures (such as cups or pieces) for this food, so only weights are offered.
| Nutrient | Amount per 100 g | % DV |
|---|---|---|
| Calories L | 351 kcal | |
| Total fat L | 1.1 g | 1% |
| Saturated fat L | 0.1 g | 0.5% |
| Sodium L | 200 mg | 9% |
| Total carbohydrates L | 77 g | 28% |
| Dietary fiber | not reported | |
| Total sugars L | 0 g | |
| Protein L | 7.5 g | 15% |
% DV: percent of the FDA Daily Value for adults (reference amounts). Letters show how each value was obtained: M measured, C calculated, L label, Z assumed zero, I imputed. Vitamins and minerals not listed were not reported by the source.
Nutritional breakdown
- Protein 9%
- Carbohydrates 89%
- Fat 3%
Approximate share of calories, using general energy factors (4 kcal/g protein and carbohydrate, 9 kcal/g fat, 7 kcal/g alcohol).
Nutritional insights
- Protein7.5 gin the top quarter of grains and pasta (median 7 g)
- Sugars0 gin the lowest quarter of grains and pasta (median 0.4 g)
- Fat1.1 gabove the median for grains and pasta (median 0.9 g)
- Saturated fat0.1 gin the lowest quarter of grains and pasta (median 0.2 g)
- Sodium200 mgin the top quarter of grains and pasta (median 4 mg)
- Protein per 100 kcal2.1 gprotein density, useful for comparing foods with different calorie levels
Product details
- Brand
- Leader Price
- Barcode
- 3367350100109
- Category
- Long grain rices
- Nutri-Score
- B as computed by Open Food Facts
Ingredients
Ingredients not reported.
Similar products
| Food | Calories | Protein | Carbs | Fat |
|---|---|---|---|---|
| Reis-fit Jasmine Rice Reis-fit | 351 | 7 g | 78 g | 0.5 g |
| Arroz largo Carrefour | 351 | 8.3 g | 76 g | 1.2 g |
| Arroz Largo Dia | 351 | 8.3 g | 75.9 g | 1.2 g |
| Arroz largo Domingo Grau | 351 | 8.3 g | 76 g | 1.2 g |
| Langkorn Spitzenreis ja! | 351 | 8 g | 75.5 g | 1.5 g |
| Langkorn Naturreis Davert | 351 | 8.5 g | 73.1 g | 2.4 g |
| Spitzen-Langkorn Reis-Fit | 351 | 7 g | 78 g | 1 g |
| Arroz largo Dia | 351 | 8.3 g | 75.9 g | 1.2 g |
Per 100 g. Calories in kcal. n/a: not reported by the source.
Source of the nutrition information
- Open Food Facts, record 3367350100109. License: ODbL 1.0 (Open Food Facts). Source record dated May 26, 2025. Imported November 6, 2026.
Last updated: . Data quality score: 80/100 (how it is calculated).
Product data from Open Food Facts, made available under the Open Database License. Values are as declared on the label; labels can change over time, so check the package you have.
General nutrition information, not medical advice. Individual needs differ; see our disclaimer.